UK Gas Technologies Group required a comprehensive fit-out and installation to modernise their facility, optimising office and operational spaces.
Office Fit Out and Installation
UK Gas Technologies Group required a comprehensive fit-out and installation to modernise their facility, optimising office and operational spaces. The project needed to improve workspace functionality, enhance security, and ensure fire safety and environmental standards compliance. A key focus was on integrating efficient electrical, HVAC, and drainage systems while also incorporating sustainable solutions such as EV charging infrastructure.
To meet the client’s needs, the project included mezzanine floor installation, partitioning, flooring, drainage, kitchen facilities, air conditioning, fire detection systems, electrical works, and security upgrades. The objective was to create a state-of-the-art facility that enhances efficiency, ensures safety, and supports future growth.
UK Gas Technologies Group recently underwent a significant transformation to enhance its operational and office spaces. The project encompassed a broad range of upgrades, from mezzanine installation and partitioning to advanced security, electrical, and HVAC systems, ensuring a modern and efficient workspace.
A 165.75m² mezzanine floor was installed, complete with a staircase, handrails, and safety features to improve accessibility. To optimise space, extensive partitioning was carried out across the ground and first floors, creating offices, meeting rooms, and specialist workspaces. High-performance acoustic and thermal insulation, glazed modules, and fire-rated doors ensured both functionality and compliance. A dedicated carbon steel fabrication room was also constructed, featuring robust double-skin steel partitions and fire-resistant glazing.
The flooring was upgraded with high-quality vinyl planks and carpet tiles, while drainage enhancements included warehouse slab cutting and channel drainage installation. A sleek new kitchen area was fitted with integrated appliances, gloss cabinetry, and premium countertops to provide a modern, user-friendly space for employees.
Comfort and energy efficiency were key considerations in the HVAC system upgrade, which introduced Daikin air conditioning, modified fresh-air ductwork, and high-efficiency heating solutions. Fire safety and security were also prioritised with an L2-standard fire alarm, Paxton access control, Texecom intruder alarms, and an 8-camera Hikvision CCTV system. Emergency lighting and smoke detection systems were installed to ensure full regulatory compliance.
The electrical fit-out featured LED lighting, PIR-controlled fixtures, and data infrastructure to support modern workplace technology. Dedicated circuits were installed to power key operational areas, and a new warehouse electrical system was implemented with upgraded sub-distribution boards. To support sustainability goals, 12 Easee 22kW EV chargers were installed with load-balancing technology, enabling efficient energy distribution across the site.
The completed project has significantly enhanced operational efficiency, safety, and compliance, providing UK Gas Technologies Group with a state-of-the-art facility designed for long-term success.
The scope of work ultimately entailed the following:
As you can see, this was quite the project to be involved with, showcasing the full array of services provided by Spacelink. How did the project turn out? Take a look below: